Site 2 — Delaware Basin
Loving County, TX · KPS-4.5 + KPS-1.5 · 10 monitored assets
Process Flow — Flare Gas Conditioning Train™ (FGCT)
The FGCT is intentionally sized larger than the power generation module to ensure fuel quality consistency, equipment protection, and long-term reliability — unlike conventional flare capture systems that use minimal filtration.
Flare Gas Conditioning Train Assets
Generator Modules & Switchgear
Modular Fleet Benchmarking
Every KPS package is stacked from identical generator blocks, so each module is compared against its true peer group across all sites — not just against siblings inside its own package.
1.5 MW module peer group
8 identical modules across the monitored fleet
2 MW module peer group
3 identical modules across the monitored fleet
System Health Submetrics
Generator 3 — Site 2 · 76% confidence
Exhaust temperature has climbed steadily over 3 weeks on Cylinder Bank B, consistent with early exhaust valve wear. Pattern matches 1 prior incident requiring valve service.
H2S media replacement — auto-drafted PO
- Projected breakthrough date: day 14 (KPS-6 Unit B)
- Vendor lead time from history: 8 days
- PO drafted: 2 × media charge + freight
- Estimated cost: $18,600
- Routed to Operations Manager for approval
Awaiting human approval — FlareGuardian never auto-executes procurement.