Demo environment · values shown are realistic estimates, not audited financials
Digital Twin

Process Twin — Site 2 — Delaware Basin

Spatial view of the physical flare-gas-to-power train. Click any node for AI detail.

Ambient: 128°F· Approaching envelope edge (-40°F to 140°F)Rated harsh-environment operation across the FGCT and KPS package.
Flare Tie-In7,200 MCFD captured
Flare Gas Conditioning Train™ (FGCT)KPS-4.5 + KPS-1.5

The FGCT is intentionally sized larger than the power generation module to ensure fuel quality consistency, equipment protection, and long-term reliability — unlike conventional flare capture systems that use minimal filtration.

NovaStar Generator Modules
Generator-Ready Fuel Delivery → Grid Tie / Site Load6 MW rated

Status legend

NominalWatchCritical